Solids Control vessel and feed tube

Solids Control rotating assembly guard consists of the semi-circular cover and vessel. It is a stainless steel case mounted on the skid. The rotating assembly can be wrapped in the vessel which can divert the liquid and solids discharge to their respective outlets and can ensure the safety. The semi-circular cover is hinged and can turn 95 degree for inspection and maintenance. For avoid mud flow off from discharge solid port during high speed rotating is fit compartments in the cover and vessel. About us, if you want to buy our products, pls click here http://www.gnsolidsamerica.com you can get more information.

Solids Control feed tube is a stainless steel tube approximately 54mm OD and 1140mm long. It extends into the bowl and conveyor through the hollow shaft on the conical end of the bowl. Mud is introduced into the centrifuge through the feed tube. The feed tube is fixed on the bracket. Its end fits a main valve, a feed water valve, a feed hose connector and a feed water connector. The main valve controls mud flow, feed water valve controls cleaning water flow. The feed hose has about 2.5m long.

Find a best solids control from factory collection at gnsolidsamerica.com. They offer products in the core categories of industry, solids control and relevant product. All the Solids Control equipment are perfectly yet quite affordable.

Drilling Mud System introduce of gnsolidsamerica

desander cone, desilter cone, hydrocyclone separator, solids controlPosted through George Hydrocycloe is actually an essential a part of solids manage, Drilling mud system ,mud system .usually the 2nd as well as 3rd stage from it we. at the. desander as well as desilter. Hydrocyclone separator is actually mentioning the actual desander cone as well as desilter cones.

Primary aspects of hydrocyclone separator

The actual desander cone as well as desilter cones each one is additionally known because hydrocyclone cones, cones tend to be essentially individual the actual solids through drilling liquids. The actual splitting up procedure is actually completed by using centrifugal causes. The actual Cones are constructed with higher durameter polyurethane along with optionally available metal inserts, that make sure constant efficiency,hydrocyclone separator.

The way the hydrocyclone separator functionsOnce the drilling dirt blend had been pumped towards the cones, using the centrifugal pressure the actual blend had been pressured to maneuver, after which the actual drilling reducing and also the dirt had been divided.the way the hydrocycle separator functions

Working Theory associated with hydrocyclone separator

Deoiling liquid/liquid hydrocyclones are utilized to split up 2 fluids associated with varying densities, at the. grams. essential oil through drinking water. Generally powered through procedure stress, greasy drinking water makes its way into the actual collection with the inlet towards the involute step and it is aimed in order to circulation across the lining walls. Pressured lower the actual lining, the actual liquid speeds up within the narrowing cross-section, as well as causes necessary to individual the actual essential oil tiny droplets tend to be created.

Centrifugal causes behaving on the actual weightier drinking water stage make it migrate towards the walls from the tapered area. The actual lighter in weight essential oil stage is actuallyout of place due to this particular as well as types the main, low-pressure primary that is eliminated by way of the actual refuse. The actual external thoroughly clean drinking water vortex leaves by way of the actual underflow.

 More information review here :

http://www.gnsolidsamerica.com/drilling-mud-circulating-system.html

How to choice Decanter Centrifuge

Apart from for that Decanter Centrifuge, within HARD DISK DRIVE solids manage program, Decanter Centrifuge may also accustomed to give food to the actual dirt in order to shale shaker. Which is situated outdoors container area, various along with essential oil drilling rig, there isn’t any pipeline to steer the actual dirt straight to the actual shaker. Frequently, we’re able to visit a dirt swimming pool, what we should require perform is actually move the actual dirt towards the shaker through the Decanter Centrifuge. It’s set up using the engine upwards as well as Decanter Centrifuge mind downwards dropped to the dirt. It’s procedure steady as well as perform effective.

 Within choice the actual Decanter Centrifuge, we ought to the majority of spot the parameter associated with circulation as well as raise. Circulation may be the dealing with capability inside device period (alway 1 hour), as the raise may be the elevation the actual Decanter Centrifuge might consider the actual dirt in order to. GN might provide numerous design Decanter Centrifuge according to these types of guidelines, to learn more relating to this kind Decanter Centrifuge, simply really feel liberated to connection with all of us.If you want to buy GNsolidsamerica company’s products, please click here to know more information: http://www.gnsolidsamerica.com/decanter-centrifuge.html

Major Equiment GN high G Drying Shale shaker

High G Dryer Shale Shaker

 One of the GN Major products is GN High G Drying Shale ShakerGN High G Force Dryer shaker is design for drying the cuttings from the primary solids control equipment, recover silts and ultra-fine sands, provide solids in a consistently stackable and conveyable form and requires no expensive chemicals or polymers.

Oil & Gas Drilling Industry complete products

  • Solids Control System Package  – Almost every drilling rig needs to be equipped with a Solids Control System Package. The Solids Control System is for cleaning the drilling fluids, so as to keep the balance of the drilling fluids that the drilling fluids may be reused the in the operation.

 

GN High G Drying Shale Shaker Features & Benefits

  1. GN High G Drying Shale Shaker High G Force adjustable up to 8 G. for flexibility for different applications
  2. Big Volume with 3.2㎡ Screen area for high capacity treatment
  3. GN High G Drying Shale Shaker Wedged type screen locking for  fast changing
  4. Italy Oli Brand Motor or Italvibras Brand Motor with less maintenance.
  5. GN High G Drying Shale Shaker Deck Adjustable While Working from -1 degree to 5° for flexiblity
  6. GN High G Drying Shale Shaker Simple Design with Linear Motion for reliable performance.
  7. Rubber and Steal Composite Material Spring for longer Life

Save Money by Buying Mud Agitator and drilling waste management

Routine maintenance will ensure maximum life and trouble-free operation. While the maintenance schedule presented in this section is not rigid, modifications should be based on experience with operating the Mud Agitator at your facilities. A maintenance log should be kept to help establish a routine maintenance schedule, as well as to monitor and adjust the schedule as necessary throughout the equipment’s life. Consider the following factors when establishing a maintenance schedule:
• Duty cycle
• Ambient temperature
• Operating environment
ROUTINE MAINTENANCE
The following maintenance routine must be performed at least daily, or each shift if possible.
These activities may be performed while the degasser is operating.
The table below contains the recommended maintenance schedule for the drilling waste management . For
additional maintenance instructions such as troubleshooting and parts replacement, refer to the
manufacturer’s literature in Section 12 – Supplier Data.
Inspection
Clean and inspect motor approximately every 500 hours of operation or every 3 months,
whichever comes first, using the following procedure:
1. Clean the motor and ventilation openings. Check that motor interior and exterior are free of
dirt, oil, grease, water, or other contaminant. Proper ventilation prevents overheating and
premature failure.
2. Using a Megger, check insulation resistance of motor winding periodically, and immediately
investigate cause of any significant drop in insulation resistance.
3. Check that all electrical connections are secure.
Bearing Lubrication
The upper motor bearing should be lubricated every 12,000 hours. The following lubricants are
approved for motor lubrication:
Exxon Mobil Polyrex EM Pennzoil Pen 2 Lube RykonPremium #2
Texaco Polystar Chevron SRI
For additional assistance and information on lubrication requirements, refer to the manufacturer’s
documentation in Section 12 – Supplier Data

Cuttings dryer is a widely used machines and equipment

GNZS752 cuttings dryer can fix different meshes screen. This equipment can use 10-200mesh screen. Usually, when the shale shaker is first stage solids control equipment the shaker screen can be 30-100mesh. When the mud system is a part of desilter, the screen can be 80-200mesh.

 Drilling waste management can among manufacturer engineer, user, and contractor discussion. Replacement screen should be selected specially from manufacturer.

 Shaker deck angle adjustment refer to fig 2.  There are lifter, pipe, lifter pipe, scale indicator, scale, connection plate, etc. When we make adjustment, handle wheel rotary by clockwise, shaker deck angle will be larger; handle wheel rotary by anti clockwise shaker deck angle will be less.

 Gnsolidsamerica is the author of the article on cuttings dryer and  Drilling waste management,find more information about mud system,you can directly visit http://www.gnsolidsamerica.com/vertical-cuttings-dryer.html

the best Mud Cleaner for sale system refer to www.gnsolidsamerica.com

Mud Cleaner for sale system,See Drawing 7 for wiring diagram of Model LW455-842N and LW355-1250N Mud Cleaner, Model LW600-945N’s and varispeed centrifuge’s is in another book, star-delta starting is adopted in this kind of centrifuge, but other principle is the same as Model LW450-842N. start-up order is: Auxiliary motor-main motor-motor of mud filling pump. You must start the machine in this way, otherwise no act take place, stop order is: motor of mud filling pump- main motor 5 min. later Auxiliary motor. 1. Installation, Mud Cleaner Instruction: 4.1 Installation Attached Drawing 1 is structure and Installation schematic diagram of the centrifuge 4.1.1 In order to fully mix recovered liquid, centrifuge should be installed on the top of No.2 tank or any other suitable place, horizontally and firmly. This is most important for recovering charged materials from charged mud. 4.1.2 The four legs of the centrifuge support should be mounted on hard-steel tank’s surface. Please lay channel iron(≥14#) on it if the surface is too mild, then mount the support’s legs on the channel iron. 4.1.3 Sand discharged groove should be popped out of the tank, and water supply pipe should be joined with the groove. The overflow opening of the centrifuge flows vertically to the reflux flume, underflow opening must have a slant of more than 60° in order to ensure that mud is drained off from the centrifuge smoothly. 4.1.4 Mud filling pump should be mounted on a proper position at the back of the sand-desander and slurry-desander, then connect the mud supply hose and mud-feed pipe by a union. 4.1.5 Connect the flushing lines and split-flow lines on mud-feed pipe and box body. 4.1.6 Power switching box should be installed for the centrifuge control system. Forbidden to connect the mains with the control box directly so as to ensure safety. 4.2 Debugging of the centrifuge 4.2.1 Remove any debris which may affect centrifuge running. 4.2.2 Check the strain of the band. 4.2.3 Rotate the pulley of main motor Mud Cleaner manually, check if any obstruction exist between rotating bowl and box or feed pipe ,remove the obstacles if any. 4.2.4 Start auxiliary motor, at the same time, fill some fresh water into the centrifuge through flushing adapter, then run for one minute. because centrifuge has been analogue status tested before delivery, so a thin layer of wall cake which can’t be discharged is stuck on the inner surface of the drum. Part of wall cake will peel off because of vibration during transportation, lead to unbalance of the drum. Serious vibration even stop(caused by main motor’s thermal protection) will occur if you start main motor to rotate in high-speed now. Fill some water in and rotate the auxiliary motor, then peeled wall cake will be soaked and redistributed, and vibration will be eliminated when starting the centrifuge for the first time. The same work should be done if the Mud Cleaner hasn’t been used for a long time,you can refer to here to visit.

Gnsolidsamerica is to provide one of the best manufacturers cuttings dryer

The smaller particles, with smaller centrifugal force, cannot be tossed to the inner wall of the Decanter Centrifuge, will be discharged from the overflow pipe with the upward movement of the liquid.

Therefore, inlet pressure is stable at 0.21-0.35 is the necessary and sufficient conditions for a normal work of the shale shaker. try to make the sand pump outlet pressure stabilize in this scale, reducing the underflow hole diameter, the cyclone pressure will larger; otherwise the pressure drop.

But too large proportion of the Desander will accelerate the wearing of sand pumps and cyclones while too small proportion will affect the purification efficiency. Because the centrifugal force and quality is proportional to the speed of the square circle, the heavier particles are tossed to the inner wall of the cyclone under the centrifugal force, then move down to the sand-discharge nozzle. Gnsolidsamerica.com is the owner of the article on cuttings dryer system and cuttings dryer, pls click contact us to know more info.pls visit us http://www.gnsolidsamerica.com

Our company launched mud system machine is worth buying

All GN equipment sold pursuant to this agreement, guarantee 14 Months after shipment or 12 months after commissioning, whichever comes first. During the guarantee period, GN will be responsible for problems caused by quality of production or raw material except the wearing spare parts of the equipment and problems caused by incorrect man-made operation, providing GN operating, maintenance and inspection recommendations are followed, and authorized oil filters and lubricants are utilized and replaced at the recommended intervals.

In the event of improper installation, abuse, misuse, improper operation or improper or lack of maintenance of  GN equipment in accordance with GN recommendation and accepted industry practice, this Warranty will become null and void with respect to such GN equipment.

Gnsolidsamerica.com is the owner of the article on mud system for sale and mud system , pls click website to know more info.  pls visit us http://www.gnsolidsamerica.com

gnsolidsamerica.com provide shaker screen equipment

GNPS752 shaker screen operation and maintenance instruction 1. Summarize 2. GNPS752 Mud Cleaner structure 3. GNPS752 Mud Cleaner technical parameters 4. GNPS752 features 5. Lifting, transportation and installation 6. Operation on Mud Cleaner 7. Mud Cleaner Maintenance 8. Spare parts for GNPS752 9. Enclosed files for GNPS752 1. Summarize Shale shaker GNPS752 is high efficiency shaker. It is designed according to users’ actual demand based on modern technique and principle. GNPS752 takes advantage of double vibration motors in-phase principle. It holding ideal design on structure, and work steadily, operated lasting time without any problem, take rather little cost on maintenance. If choose proper model or parameters, it can work for many kinds of drilling fluid solids control. It is an ideal solution for Oil and gas drilling, HDD, Metallurgy, mining tail mud solids control 2. GNPS752 shale shaker screen structure Please find GNPS752 shaker structure as fig I. It contains pedestal, shaker deck, tension wedge, shaker screen, rubber strip, deck adjustment device, baffle box, tension device, electric cabinet, vibration motor, damping spring. Shale shaker GNPS752 can be used by single or designed as tandem and triplex shaker to be operated at drilling job site 3. GNPS752 Mud Cleaner technical parameters Model: GNPS752 Vibration: Balanced elliptical motion Vibration amplitude: 7mm (double type) Motor power: 1.0+0.4 kW Treating capacity: 25L/S Screen area: 1.35m2 Screens: 750×900,10~150 mesh (Frame screen or Pyramid frame screen) Dimension: 2037×1525×1112mm Weight: 1100kg Resource Box : The author of the article recommends Mud Cleaner pls click here to know.